Fabrication of metallic pressure vessels / Owen R. Greulich, Maan H. Jawad.

By: Greulich, Owen R [author.]
Contributor(s): Jawad, Maan H [author.]
Language: English Series: Wiley-ASME Press series: Publisher: Hoboken, NJ : John Wiley & Sons, Inc., 2021Edition: First editionDescription: 1 online resourceContent type: text Media type: computer Carrier type: online resourceISBN: 9781119674863 ; 9781119674887; 1119674883; 9781119674900; 1119674905; 9781119674870; 1119674875Subject(s): Pressure vessels -- Design and constructionGenre/Form: Electronic books.DDC classification: 681/.76041 LOC classification: TA660.T34Online resources: Full text is available at Wiley Online Library Click here to view
Contents:
Table of Contents Preface xvii Acknowledgments xix 1 Introduction 1 1.1 Introduction 1 1.2 Fabrication Sequence 1 1.3 Cost Considerations 5 1.3.1 Types of costs 5 1.3.2 Design choices 6 1.3.3 Shipping 11 1.3.4 General approach to cost control 12 1.4 Fabrication of Nonnuclear Versus Nuclear Pressure Vessels 12 1.5 Units and Abbreviations 13 1.6 Summary 14 2 Materials of Construction 15 2.1 Introduction 15 2.2 Ferrous Alloys 16 2.2.1 Carbon steels (Mild steels) 16 2.2.2 Low alloy steels (Cr–Mo steels) 18 2.2.3 High alloy steels (stainless steels) 19 2.2.4 Cost of ferrous alloys 20 2.3 Nonferrous Alloys 20 2.3.1 Aluminum alloys 20 2.3.2 Copper alloys 22 2.3.3 Nickel alloys 30 2.3.4 Titanium alloys 30 2.3.5 Zirconium alloys 30 2.3.6 Tantalum alloys 32 2.3.7 Price of nonferrous alloys 33 2.4 Density of Some Ferrous and Nonferrous Alloys 34 2.5 Nonmetallic Vessels 35 2.6 Forms and Documentation 35 2.7 Miscellaneous Materials 38 2.7.1 Cast iron 38 2.7.2 Gaskets 38 References 43 3 Layout 44 3.1 Introduction 44 3.2 Applications 44 3.3 Tools and Their Use 45 3.4 Layout Basics 45 3.4.1 Projection 46 3.4.2 Triangulation 46 3.5 Material Thickness and Bending Allowance 49 3.6 Angles and Channels 50 3.7 Marking Conventions 52 3.8 Future of Plate Layout 54 Reference 54 4 Material Forming 55 4.1 Introduction 55 4.1.1 Bending versus three-dimensional forming 55 4.1.2 Other issues 55 4.1.3 Plastic Theory 56 4.1.4 Forming limits 62 4.1.5 Grain direction 64 4.1.6 Cold versus hot forming 64 4.1.7 Spring back 64 4.2 Brake Forming (Angles, Bump-Forming) 65 4.2.1 Types of dies 67 4.2.2 Brake work forming limits 68 4.2.3 Crimping 68 4.2.4 Bending of pipes and tubes 69 4.2.5 Brake forming loads 70 4.3 Roll Forming (Shells, Reinforcing Pads, Pipe/Tube) 70 4.3.1 Pyramid rolls 70 4.3.2 Pinch rolls 71 4.3.3 Two-roll systems 71 4.3.4 Rolling radius variability compensation 72 4.3.5 Heads and caps 72 4.3.6 Hot forming 74 4.4 Tolerances 74 4.4.1 Brake forming tolerances 75 4.4.2 Roll forming tolerances 76 4.4.3 Press forming tolerances 76 4.4.4 Flanging tolerances 76 Reference 76 5 Fabrication 77 5.1 Introduction 77 5.2 Layout 77 5.3 Weld Preparation 78 5.3.1 Hand and automatic grinders 78 5.3.2 Nibblers 78 5.3.3 Flame cutting 79 5.3.4 Boring mills 79 5.3.5 Lathes 80 5.3.6 Routers 80 5.3.7 Other cutter arrangements 82 5.4 Forming 82 5.5 Vessel Fit Up and Assembly 83 5.5.1 The fitter 84 5.5.2 Fit up tools 84 5.5.3 Persuasion and other fit up techniques 84 5.5.4 Fixturing 85 5.5.5 Welding fit up 86 5.5.6 Weld shrinkage 88 5.5.7 Order of assembly 89 5.6 Welding 90 5.6.1 Welding position 90 5.6.2 Welding residual stresses 90 5.6.3 Welding positioners, turning rolls, column and boom weld manipulators 91 5.7 Correction of Distortion 94 5.8 Heat Treatment 94 5.8.1 Welding preheat 95 5.8.2 Interpass temperature 95 5.8.3 Post weld heat treatment 96 5.9 Post-fabrication Machining 96 5.10 Field Fabrication – Special Issues 96 5.10.1 Exposure to the elements 97 5.10.2 Staging area 97 5.10.3 Tool and equipment availability 98 5.10.4 Staffing 98 5.10.5 Material handling 98 5.10.6 Energy sources 99 5.10.7 PWHT 99 5.10.8 Layout 100 5.10.9 Fit up 100 5.10.10 Welding 100 5.11 Machining 101 5.12 Cold Springing 101 6 Cutting and Machining 102 6.1 Introduction 102 6.2 Common Cutting Operations for Pressure Vessels 102 6.3 Cutting Processes 103 6.3.1 Plate cutting 103 6.3.2 Pipe, bar, and structural shape cutting 108 6.4 Common Machining Functions and Processes 110 6.5 Common Machining Functions for Pressure Vessels 111 6.5.1 Weld preparation 111 6.5.2 Machining of flanges 111 6.5.3 Tubesheets 112 6.5.4 Heat exchanger channels 113 6.5.5 Heat exchanger baffles 113 6.6 Setup Issues 114 6.7 Material Removal Rates 116 6.7.1 Feed 116 6.7.2 Speed 116 6.7.3 Depth of cut 116 6.8 Milling 117 6.9 Turning and Boring 119 6.10 Machining Centers 120 6.11 Drilling 120 6.12 Tapping 121 6.13 Water Jet Cutting 122 6.14 Laser Machining 123 6.15 Reaming 123 6.16 Electrical Discharge Machining, Plunge and Wire 123 6.17 Electrochemical Machining 124 6.18 Electron Beam Machining 124 6.19 Photochemical Machining 124 6.20 Ultrasonic Machining 125 6.21 Planing and Shaping 125 6.22 Broaching 125 6.23 3D Printing 125 6.24 Summary 126 Reference 126 7 Welding 127 7.1 Introduction 127 7.2 Weld Details and Symbols 127 7.2.1 Single fillet welds 128 7.2.2 Double fillet welds 128 7.2.3 Intermittent fillet welds 128 7.2.4 Single-bevel butt welds 129 7.2.5 Double-bevel butt welds 129 7.2.6 J-groove or double J-groove welds 129 7.2.7 Backing strips 131 7.2.8 Consumables 131 7.2.9 Tube-to-tubesheet welds 131 7.2.10 Weld symbols 131 7.3 Weld Processes 132 7.3.1 Diffusion welding (DFW) 135 7.3.2 Electron beam welding (EBW) 135 7.3.3 Electrogas welding (EGW) 136 7.3.4 Electroslag welding (ESW) 136 7.3.5 Flux-cored arc welding (FCAW) 137 7.3.6 Flash welding 137 7.3.7 Friction stir welding (FSW) 137 7.3.8 Gas metal-arc welding (GMAW) 138 7.3.9 Gas tungsten-arc welding (GTAW) 138 7.3.10 Laser beam welding (LBW) 139 7.3.11 Orbital welding 140 7.3.12 Oxyfuel gas welding (OFW) 140 7.3.13 Plasma-arc welding (PAW) 141 7.3.14 Resistance spot welding (RSW) 141 7.3.15 Resistance seam welding (RSEW) 142 7.3.16 Submerged-arc welding (SAW) 142 7.3.17 Shielded metal-arc welding (SMAW) 142 7.3.18 Stud welding 143 7.4 Weld Preheat and Interpass Temperature 143 7.5 Post Weld Heat Treating 143 7.6 Welding Procedures 143 7.7 Control of Residual Stress and Distortion 144 7.8 Material Handling to Facilitate Welding 145 7.9 Weld Repair 145 7.10 Brazing 145 7.10.1 Applications 145 7.10.2 Filler metal 145 7.10.3 Heating 145 7.10.4 Flux 145 7.10.5 Brazing procedures 146 Reference 146 8 Welding Procedures and Post Weld Heat Treatment 147 8.1 Introduction 147 8.2 Welding Procedures 147 8.3 Weld Preparation Special Requirements 153 8.4 Weld Joint Design and Process to Reduce Stress and Distortion 156 8.4.1 Reduced heat input 156 8.4.2 Lower temperature differential 156 8.4.3 Choice of weld process 156 8.4.4 Weld configuration and sequencing 157 8.5 Weld Preheat and Interpass Temperature 157 8.6 Welder Versus Welding Operator 158 8.6.1 Welders 158 8.6.2 Welding operators 158 8.6.3 Differences in qualifications 159 8.7 Weld Repair 159 8.7.1 Slag inclusion during welding 159 8.7.2 Surface indications after cooling of welds 159 8.7.3 Delayed hydrogen cracking after welding 159 8.7.4 Cracks occurring subsequent to PWHT 160 8.8 Post Weld Heat Treating 160 8.8.1 PWHT of carbon steels 160 8.8.2 PWHT of low alloy steels 161 8.8.3 Some general PWHT requirements for carbon steels and low alloy steels 161 8.8.4 PWHT of stainless steel 162 8.8.5 PWHT of nonferrous alloys 162 8.9 Cladding, Overlay, and Loose Liners 162 8.9.1 Cladding 162 8.9.2 Weld overlay 163 8.9.3 Loose liners 164 8.10 Brazing 164 8.10.1 Applications 165 8.10.2 Filler metal 165 8.10.3 Heating 165 8.10.4 Flux 166 8.10.5 Brazing procedures 166 Reference 166 9 Fabrication of Pressure Equipment Having Unique Characteristics 167 9.1 Introduction 167 9.2 Heat Exchangers 167 9.2.1 U-tube heat exchangers 169 9.2.2 Fixed heat exchangers 170 9.2.3 Floating head heat exchangers 170 9.2.4 Attachment of tubes-to-tubesheets and tubes-to-headers 170 9.2.5 Expansion joints 176 9.2.6 Assembly of heat exchangers 178 9.3 Dimpled Jackets 180 9.4 Layered Vessels 181 9.4.1 Introduction 181 9.4.2 Fabrication of layered shells 181 9.5 Rectangular Vessels 187 9.6 Vessels with Refractory and Insulation 188 9.7 Vessel Supports 190 9.8 Summary 191 References 192 10 Surface Finishes 193 10.1 Introduction 193 10.2 Types of Surface Finishes 193 10.2.1 Surface characteristics, unfinished 194 10.2.2 Passivation 195 10.2.3 Applied coatings 196 Reference 199 11 Handling and Transportation 200 11.1 Introduction 200 11.2 Handling of Vessels and Vessel Components Within the Fabrication Plant 200 11.3 Transportation of Standard Loads 202 11.4 Transportation of Heavy Vessels 204 11.4.1 Handling heavy vessels using specialty cranes 204 11.4.2 Shipping by truck 204 11.4.3 Shipping by rail 208 11.4.4 Shipping by barge or ship 212 11.4.5 Shipping by air 215 11.5 Summary 216 12 ASME Code Compliance and Quality Control System 217 12.1 Need for ASME Code Compliance 217 12.2 What the ASME Code Provides 217 12.3 Fabrication in Accordance with the ASME Code 217 12.4 ASME Code Stamped Vessels 218 12.4.1 Design calculations 218 12.4.2 Fabrication drawings 218 12.4.3 Material mill test reports 218 12.4.4 WPS for the vessel welds 219 12.4.5 Records of nondestructive (NDE) examination 219 12.4.6 Record of PWHT 219 12.4.7 Record of hydrotesting 220 12.4.8 Manufacturer’s Data Report, U-1 Form 220 12.4.9 Manufacturer’s Partial Data Report, U-2 form 222 12.4.10 Name plate 222 12.5 Authorized Inspector and Authorized Inspection Agency 224 12.6 Quality Control System for Fabrication 224 12.6.1 Organizational chart 225 12.6.2 Authority and responsibility 225 12.6.3 Quality control system 225 12.6.4 Design and drawing control 225 12.6.5 Material control 225 12.6.6 Production control 225 12.6.7 Inspection 225 12.6.8 Hydrostatic and pneumatic testing 225 12.6.9 Code stamping 226 12.6.10 Discrepancies and nonconformances 226 12.6.11 Welding 226 12.6.12 Nondestructive examination 226 12.6.13 Heat treatment control 226 12.6.14 Calibration of measuring and test equipment 226 12.6.15 Records retention 226 12.6.16 Handling, storage, and shipping 226 12.7 Additional Stamps Required for Pressure Vessels 226 12.7.1 National Board stamping, NB 227 12.7.2 Jurisdictional stamping 227 12.7.3 User stamping 227 12.7.4 Canadian Registration Numbers 227 12.8 Non-Code Jurisdictions 227 12.9 Temporary Shop Locations 228 Reference 229 13 Repair of Existing Equipment 230 13.1 Introduction 230 13.2 National Board Inspection Code, NBIC, NB-23 231 13.2.1 Repairs 231 13.2.2 Alterations 232 13.2.3 Reratings 232 13.2.4 Post weld heat treating of repaired components 232 13.2.5 Hydrostatic or pneumatic testing of repaired vessels 234 13.3 ASME Post Construction Code, PCC-2 236 13.3.1 External weld buildup to repair internal thinning 236 13.3.2 Full encirclement steel reinforcing sleeves for pipes in corroded areas 237 13.3.3 Welded hot taps 238 13.4 API Pressure Vessel Inspection Code, API-510 241 13.5 API 579/ASME FFS-1 Fitness-For-Service Code 242 13.6 Miscellaneous Repairs 242 13.6.1 Removal of seized nuts 243 13.6.2 Structural supports and foundation 243 References 244 Appendix A Units and Conversion Factors 245 Appendix B Welding Symbols 247 Appendix C Weld Process Characteristics 251 Appendix D Weld Deposition 254 Appendix E Shape Properties 257 Appendix F Pipe and Tube Dimensions and Weights 263 Appendix G Bending and Expanding of Pipes and Tubes 278 Appendix H Dimensions of Some Commonly Used Bolts and Their Required Minimum Spacing 286 Appendix I Shackles 288 Appendix J Shears, Moments, and Deflections of Beams 295 Appendix K Commonly Used Terminology 299 Index 304
Summary: "Much of the equipment used in the refining and processing industries is known as Process Equipment. Most pieces of process equipment are designed to perform specific, singular tasks. Process equipment can be used for tasks a varied as storage, controlling flow, and containing chemical reactions. Fabrication involves making products and components from raw or semi-finished materials by cutting, shaping and joining sections of metal together. Fabrication processes include cutting, folding, machining, shearing, stamping and welding"-- Provided by publisher.
Tags from this library: No tags from this library for this title. Log in to add tags.
    Average rating: 0.0 (0 votes)
Item type Current location Home library Call number Status Date due Barcode Item holds
EBOOK EBOOK COLLEGE LIBRARY
COLLEGE LIBRARY
681.76041 G868 2021 (Browse shelf) Available
Total holds: 0

Includes bibliographical references and index.

Table of Contents
Preface xvii

Acknowledgments xix

1 Introduction 1

1.1 Introduction 1

1.2 Fabrication Sequence 1

1.3 Cost Considerations 5

1.3.1 Types of costs 5

1.3.2 Design choices 6

1.3.3 Shipping 11

1.3.4 General approach to cost control 12

1.4 Fabrication of Nonnuclear Versus Nuclear Pressure Vessels 12

1.5 Units and Abbreviations 13

1.6 Summary 14

2 Materials of Construction 15

2.1 Introduction 15

2.2 Ferrous Alloys 16

2.2.1 Carbon steels (Mild steels) 16

2.2.2 Low alloy steels (Cr–Mo steels) 18

2.2.3 High alloy steels (stainless steels) 19

2.2.4 Cost of ferrous alloys 20

2.3 Nonferrous Alloys 20

2.3.1 Aluminum alloys 20

2.3.2 Copper alloys 22

2.3.3 Nickel alloys 30

2.3.4 Titanium alloys 30

2.3.5 Zirconium alloys 30

2.3.6 Tantalum alloys 32

2.3.7 Price of nonferrous alloys 33

2.4 Density of Some Ferrous and Nonferrous Alloys 34

2.5 Nonmetallic Vessels 35

2.6 Forms and Documentation 35

2.7 Miscellaneous Materials 38

2.7.1 Cast iron 38

2.7.2 Gaskets 38

References 43

3 Layout 44

3.1 Introduction 44

3.2 Applications 44

3.3 Tools and Their Use 45

3.4 Layout Basics 45

3.4.1 Projection 46

3.4.2 Triangulation 46

3.5 Material Thickness and Bending Allowance 49

3.6 Angles and Channels 50

3.7 Marking Conventions 52

3.8 Future of Plate Layout 54

Reference 54

4 Material Forming 55

4.1 Introduction 55

4.1.1 Bending versus three-dimensional forming 55

4.1.2 Other issues 55

4.1.3 Plastic Theory 56

4.1.4 Forming limits 62

4.1.5 Grain direction 64

4.1.6 Cold versus hot forming 64

4.1.7 Spring back 64

4.2 Brake Forming (Angles, Bump-Forming) 65

4.2.1 Types of dies 67

4.2.2 Brake work forming limits 68

4.2.3 Crimping 68

4.2.4 Bending of pipes and tubes 69

4.2.5 Brake forming loads 70

4.3 Roll Forming (Shells, Reinforcing Pads, Pipe/Tube) 70

4.3.1 Pyramid rolls 70

4.3.2 Pinch rolls 71

4.3.3 Two-roll systems 71

4.3.4 Rolling radius variability compensation 72

4.3.5 Heads and caps 72

4.3.6 Hot forming 74

4.4 Tolerances 74

4.4.1 Brake forming tolerances 75

4.4.2 Roll forming tolerances 76

4.4.3 Press forming tolerances 76

4.4.4 Flanging tolerances 76

Reference 76

5 Fabrication 77

5.1 Introduction 77

5.2 Layout 77

5.3 Weld Preparation 78

5.3.1 Hand and automatic grinders 78

5.3.2 Nibblers 78

5.3.3 Flame cutting 79

5.3.4 Boring mills 79

5.3.5 Lathes 80

5.3.6 Routers 80

5.3.7 Other cutter arrangements 82

5.4 Forming 82

5.5 Vessel Fit Up and Assembly 83

5.5.1 The fitter 84

5.5.2 Fit up tools 84

5.5.3 Persuasion and other fit up techniques 84

5.5.4 Fixturing 85

5.5.5 Welding fit up 86

5.5.6 Weld shrinkage 88

5.5.7 Order of assembly 89

5.6 Welding 90

5.6.1 Welding position 90

5.6.2 Welding residual stresses 90

5.6.3 Welding positioners, turning rolls, column and boom weld manipulators 91

5.7 Correction of Distortion 94

5.8 Heat Treatment 94

5.8.1 Welding preheat 95

5.8.2 Interpass temperature 95

5.8.3 Post weld heat treatment 96

5.9 Post-fabrication Machining 96

5.10 Field Fabrication – Special Issues 96

5.10.1 Exposure to the elements 97

5.10.2 Staging area 97

5.10.3 Tool and equipment availability 98

5.10.4 Staffing 98

5.10.5 Material handling 98

5.10.6 Energy sources 99

5.10.7 PWHT 99

5.10.8 Layout 100

5.10.9 Fit up 100

5.10.10 Welding 100

5.11 Machining 101

5.12 Cold Springing 101

6 Cutting and Machining 102

6.1 Introduction 102

6.2 Common Cutting Operations for Pressure Vessels 102

6.3 Cutting Processes 103

6.3.1 Plate cutting 103

6.3.2 Pipe, bar, and structural shape cutting 108

6.4 Common Machining Functions and Processes 110

6.5 Common Machining Functions for Pressure Vessels 111

6.5.1 Weld preparation 111

6.5.2 Machining of flanges 111

6.5.3 Tubesheets 112

6.5.4 Heat exchanger channels 113

6.5.5 Heat exchanger baffles 113

6.6 Setup Issues 114

6.7 Material Removal Rates 116

6.7.1 Feed 116

6.7.2 Speed 116

6.7.3 Depth of cut 116

6.8 Milling 117

6.9 Turning and Boring 119

6.10 Machining Centers 120

6.11 Drilling 120

6.12 Tapping 121

6.13 Water Jet Cutting 122

6.14 Laser Machining 123

6.15 Reaming 123

6.16 Electrical Discharge Machining, Plunge and Wire 123

6.17 Electrochemical Machining 124

6.18 Electron Beam Machining 124

6.19 Photochemical Machining 124

6.20 Ultrasonic Machining 125

6.21 Planing and Shaping 125

6.22 Broaching 125

6.23 3D Printing 125

6.24 Summary 126

Reference 126

7 Welding 127

7.1 Introduction 127

7.2 Weld Details and Symbols 127

7.2.1 Single fillet welds 128

7.2.2 Double fillet welds 128

7.2.3 Intermittent fillet welds 128

7.2.4 Single-bevel butt welds 129

7.2.5 Double-bevel butt welds 129

7.2.6 J-groove or double J-groove welds 129

7.2.7 Backing strips 131

7.2.8 Consumables 131

7.2.9 Tube-to-tubesheet welds 131

7.2.10 Weld symbols 131

7.3 Weld Processes 132

7.3.1 Diffusion welding (DFW) 135

7.3.2 Electron beam welding (EBW) 135

7.3.3 Electrogas welding (EGW) 136

7.3.4 Electroslag welding (ESW) 136

7.3.5 Flux-cored arc welding (FCAW) 137

7.3.6 Flash welding 137

7.3.7 Friction stir welding (FSW) 137

7.3.8 Gas metal-arc welding (GMAW) 138

7.3.9 Gas tungsten-arc welding (GTAW) 138

7.3.10 Laser beam welding (LBW) 139

7.3.11 Orbital welding 140

7.3.12 Oxyfuel gas welding (OFW) 140

7.3.13 Plasma-arc welding (PAW) 141

7.3.14 Resistance spot welding (RSW) 141

7.3.15 Resistance seam welding (RSEW) 142

7.3.16 Submerged-arc welding (SAW) 142

7.3.17 Shielded metal-arc welding (SMAW) 142

7.3.18 Stud welding 143

7.4 Weld Preheat and Interpass Temperature 143

7.5 Post Weld Heat Treating 143

7.6 Welding Procedures 143

7.7 Control of Residual Stress and Distortion 144

7.8 Material Handling to Facilitate Welding 145

7.9 Weld Repair 145

7.10 Brazing 145

7.10.1 Applications 145

7.10.2 Filler metal 145

7.10.3 Heating 145

7.10.4 Flux 145

7.10.5 Brazing procedures 146

Reference 146

8 Welding Procedures and Post Weld Heat Treatment 147

8.1 Introduction 147

8.2 Welding Procedures 147

8.3 Weld Preparation Special Requirements 153

8.4 Weld Joint Design and Process to Reduce Stress and Distortion 156

8.4.1 Reduced heat input 156

8.4.2 Lower temperature differential 156

8.4.3 Choice of weld process 156

8.4.4 Weld configuration and sequencing 157

8.5 Weld Preheat and Interpass Temperature 157

8.6 Welder Versus Welding Operator 158

8.6.1 Welders 158

8.6.2 Welding operators 158

8.6.3 Differences in qualifications 159

8.7 Weld Repair 159

8.7.1 Slag inclusion during welding 159

8.7.2 Surface indications after cooling of welds 159

8.7.3 Delayed hydrogen cracking after welding 159

8.7.4 Cracks occurring subsequent to PWHT 160

8.8 Post Weld Heat Treating 160

8.8.1 PWHT of carbon steels 160

8.8.2 PWHT of low alloy steels 161

8.8.3 Some general PWHT requirements for carbon steels and low alloy steels 161

8.8.4 PWHT of stainless steel 162

8.8.5 PWHT of nonferrous alloys 162

8.9 Cladding, Overlay, and Loose Liners 162

8.9.1 Cladding 162

8.9.2 Weld overlay 163

8.9.3 Loose liners 164

8.10 Brazing 164

8.10.1 Applications 165

8.10.2 Filler metal 165

8.10.3 Heating 165

8.10.4 Flux 166

8.10.5 Brazing procedures 166

Reference 166

9 Fabrication of Pressure Equipment Having Unique Characteristics 167

9.1 Introduction 167

9.2 Heat Exchangers 167

9.2.1 U-tube heat exchangers 169

9.2.2 Fixed heat exchangers 170

9.2.3 Floating head heat exchangers 170

9.2.4 Attachment of tubes-to-tubesheets and tubes-to-headers 170

9.2.5 Expansion joints 176

9.2.6 Assembly of heat exchangers 178

9.3 Dimpled Jackets 180

9.4 Layered Vessels 181

9.4.1 Introduction 181

9.4.2 Fabrication of layered shells 181

9.5 Rectangular Vessels 187

9.6 Vessels with Refractory and Insulation 188

9.7 Vessel Supports 190

9.8 Summary 191

References 192

10 Surface Finishes 193

10.1 Introduction 193

10.2 Types of Surface Finishes 193

10.2.1 Surface characteristics, unfinished 194

10.2.2 Passivation 195

10.2.3 Applied coatings 196

Reference 199

11 Handling and Transportation 200

11.1 Introduction 200

11.2 Handling of Vessels and Vessel Components Within the Fabrication Plant 200

11.3 Transportation of Standard Loads 202

11.4 Transportation of Heavy Vessels 204

11.4.1 Handling heavy vessels using specialty cranes 204

11.4.2 Shipping by truck 204

11.4.3 Shipping by rail 208

11.4.4 Shipping by barge or ship 212

11.4.5 Shipping by air 215

11.5 Summary 216

12 ASME Code Compliance and Quality Control System 217

12.1 Need for ASME Code Compliance 217

12.2 What the ASME Code Provides 217

12.3 Fabrication in Accordance with the ASME Code 217

12.4 ASME Code Stamped Vessels 218

12.4.1 Design calculations 218

12.4.2 Fabrication drawings 218

12.4.3 Material mill test reports 218

12.4.4 WPS for the vessel welds 219

12.4.5 Records of nondestructive (NDE) examination 219

12.4.6 Record of PWHT 219

12.4.7 Record of hydrotesting 220

12.4.8 Manufacturer’s Data Report, U-1 Form 220

12.4.9 Manufacturer’s Partial Data Report, U-2 form 222

12.4.10 Name plate 222

12.5 Authorized Inspector and Authorized Inspection Agency 224

12.6 Quality Control System for Fabrication 224

12.6.1 Organizational chart 225

12.6.2 Authority and responsibility 225

12.6.3 Quality control system 225

12.6.4 Design and drawing control 225

12.6.5 Material control 225

12.6.6 Production control 225

12.6.7 Inspection 225

12.6.8 Hydrostatic and pneumatic testing 225

12.6.9 Code stamping 226

12.6.10 Discrepancies and nonconformances 226

12.6.11 Welding 226

12.6.12 Nondestructive examination 226

12.6.13 Heat treatment control 226

12.6.14 Calibration of measuring and test equipment 226

12.6.15 Records retention 226

12.6.16 Handling, storage, and shipping 226

12.7 Additional Stamps Required for Pressure Vessels 226

12.7.1 National Board stamping, NB 227

12.7.2 Jurisdictional stamping 227

12.7.3 User stamping 227

12.7.4 Canadian Registration Numbers 227

12.8 Non-Code Jurisdictions 227

12.9 Temporary Shop Locations 228

Reference 229

13 Repair of Existing Equipment 230

13.1 Introduction 230

13.2 National Board Inspection Code, NBIC, NB-23 231

13.2.1 Repairs 231

13.2.2 Alterations 232

13.2.3 Reratings 232

13.2.4 Post weld heat treating of repaired components 232

13.2.5 Hydrostatic or pneumatic testing of repaired vessels 234

13.3 ASME Post Construction Code, PCC-2 236

13.3.1 External weld buildup to repair internal thinning 236

13.3.2 Full encirclement steel reinforcing sleeves for pipes in corroded areas 237

13.3.3 Welded hot taps 238

13.4 API Pressure Vessel Inspection Code, API-510 241

13.5 API 579/ASME FFS-1 Fitness-For-Service Code 242

13.6 Miscellaneous Repairs 242

13.6.1 Removal of seized nuts 243

13.6.2 Structural supports and foundation 243

References 244

Appendix A Units and Conversion Factors 245

Appendix B Welding Symbols 247

Appendix C Weld Process Characteristics 251

Appendix D Weld Deposition 254

Appendix E Shape Properties 257

Appendix F Pipe and Tube Dimensions and Weights 263

Appendix G Bending and Expanding of Pipes and Tubes 278

Appendix H Dimensions of Some Commonly Used Bolts and Their Required Minimum Spacing 286

Appendix I Shackles 288

Appendix J Shears, Moments, and Deflections of Beams 295

Appendix K Commonly Used Terminology 299

Index 304

"Much of the equipment used in the refining and processing industries is known as Process Equipment. Most pieces of process equipment are designed to perform specific, singular tasks. Process equipment can be used for tasks a varied as storage, controlling flow, and containing chemical reactions. Fabrication involves making products and components from raw or semi-finished materials by cutting, shaping and joining sections of metal together. Fabrication processes include cutting, folding, machining, shearing, stamping and welding"-- Provided by publisher.

About the Author
Owen R. Greulich is active on the High Pressure Task Group of the American Society of Mechanical Engineers’ Process Piping Code Committee and the American Institute of Aeronautics and Astronautics (AIAA) Aerospace Pressure Vessel Committee. He previously served as Pressure and Energetic Systems Safety Manager in the Office of Safety and Mission Assurance at NASA Headquarters, responsible for the safety of pressure and vacuum systems.

Maan H. Jawad is President of Global Engineering & Technology in the United States. He was previously on the Board of Directors and Director of Engineering of the Nooter Corporation. He is active on various ASME Codes and Standards committees and the author of numerous books and publications related to pressure vessels.

There are no comments for this item.

to post a comment.