Data centre essentials : (Record no. 91881)

000 -LEADER
fixed length control field 08605cam a2200457 i 4500
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20250819082051.0
006 - FIXED-LENGTH DATA ELEMENTS--ADDITIONAL MATERIAL CHARACTERISTICS--GENERAL INFORMATION
fixed length control field m o d
007 - PHYSICAL DESCRIPTION FIXED FIELD--GENERAL INFORMATION
fixed length control field cr cnu---unuuu
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 250819t20232023njum ob u001 0 eng
020 ## - INTERNATIONAL STANDARD BOOK NUMBER
International Standard Book Number 9781119898818
Qualifying information hardcover
020 ## - INTERNATIONAL STANDARD BOOK NUMBER
International Standard Book Number 9781119898832
Qualifying information electronic book
020 ## - INTERNATIONAL STANDARD BOOK NUMBER
International Standard Book Number 1119898838
Qualifying information electronic book
020 ## - INTERNATIONAL STANDARD BOOK NUMBER
International Standard Book Number 9781119898849
Qualifying information electronic book
020 ## - INTERNATIONAL STANDARD BOOK NUMBER
International Standard Book Number 1119898846
Qualifying information electronic book
020 ## - INTERNATIONAL STANDARD BOOK NUMBER
International Standard Book Number 111989882X
Qualifying information electronic book
020 ## - INTERNATIONAL STANDARD BOOK NUMBER
International Standard Book Number 9781119898825
Qualifying information (electronic bk.)
035 ## - SYSTEM CONTROL NUMBER
System control number (OCoLC)1371653306
041 ## - LANGUAGE CODE
Language code of text/sound track or separate title eng
042 ## - AUTHENTICATION CODE
Authentication code pcc
050 04 - LIBRARY OF CONGRESS CALL NUMBER
Classification number TJ163.5.D38
Item number F64 2023
082 00 - DEWEY DECIMAL CLASSIFICATION NUMBER
Classification number 005.74
Edition number 23/eng/20230224
100 1# - MAIN ENTRY--PERSONAL NAME
Preferred name for the person Fogarty, Vincent,
Authority record control number https://id.loc.gov/authorities/names/no2023018843
Relator term author.
245 10 - TITLE STATEMENT
Title Data centre essentials :
Remainder of title design, construction, and operation of data centres for the non-expert /
Statement of responsibility, etc Vincent Fogarty, Sophia Flucker.
264 #1 - PUBLICATION, DISTRIBUTION, ETC. (IMPRINT)
Place of publication, distribution, etc Hoboken, NJ :
Name of publisher, distributor, etc John Wiley & Sons, Inc.,
Date of publication, distribution, etc 2023.
264 #4 - PUBLICATION, DISTRIBUTION, ETC. (IMPRINT)
Date of publication, distribution, etc ©2023.
300 ## - PHYSICAL DESCRIPTION
Extent 1 online resource (xxvi, 213 pages) :
Other physical details illustrations (some color)
336 ## - CONTENT TYPE
Content type term text
Content type code txt
Source rdacontent.
337 ## - MEDIA TYPE
Media type term computer
Media type code c
Source rdamedia.
338 ## - CARRIER TYPE
Carrier type term online resource
Carrier type code cr
Source rdacarrier.
340 ## - PHYSICAL MEDIUM
Source rdacc
Authority record control number or standard number http://rdaregistry.info/termList/RDAColourContent/1003.
504 ## - BIBLIOGRAPHY, ETC. NOTE
Bibliography, etc Includes bibliographical references and index.
505 0# - CONTENTS
Formatted contents note Table of Contents<br/>Acronyms & Symbols xi<br/><br/>Foreword by Tom Glover xv<br/><br/>Preface xvii<br/><br/>Acknowledgements xxi<br/><br/>About the Authors xxiii<br/><br/>1 Introduction 1<br/><br/>2 What Drives the Need and the Various Types of Data Centres 5<br/><br/>Data Demand versus Compute Efficiency 8<br/><br/>Workload Placement 15<br/><br/>The Core Components of a Data Centre 18<br/><br/>Types of Data Centres 18<br/><br/>Entreprise Data Centre 18<br/><br/>Colocation 20<br/><br/>Public Cloud 21<br/><br/>Urban or Edge 21<br/><br/>3 Site Selection 23<br/><br/>Climate 26<br/><br/>Access Roads and Airports 27<br/><br/>Air Quality 27<br/><br/>Likelihood of Natural Disasters 28<br/><br/>Ground Conditions 29<br/><br/>Communications Infrastructure 29<br/><br/>Latency 30<br/><br/>Proximity to Subsea Cable Landing Sites 33<br/><br/>Density of Fibre Telecommunication Networks Near the Data Centre 33<br/><br/>Geopolitical Risks, Laws, and Regulations 34<br/><br/>Availability and Cost of Electrical Power 35<br/><br/>Natural Resources 36<br/><br/>Airport Flight Paths 36<br/><br/>Electromagnetic Interference 37<br/><br/>Taxes, Regulations, and Incentives 38<br/><br/>Incentives 39<br/><br/>Know the Stakeholders 41<br/><br/>Expect the Unexpected 41<br/><br/>Traditional Due Diligence 42<br/><br/>Retrofitting Commercial Buildings for Data Centres 42<br/><br/>Clusters 43<br/><br/>Qualitative Analysis 48<br/><br/>Quantitative Analysis 48<br/><br/>4 IT Operations and the Evolution of the Data Centre 51<br/>Max Schulze<br/><br/>Beginning of IT Infrastructure 54<br/><br/>Bringing Enterprise IT to Maturity 55<br/><br/>IT Applications as Standalone Products – The Digital Economy 55<br/><br/>Second Iteration of the Internet 58<br/><br/>Key Ingredients for Digital Products 61<br/><br/>Difference Between Enterprise IT Infrastructure and Hosting Infrastructure 64<br/><br/>Commoditisation of IT Infrastructure 65<br/><br/>Virtualisation: Servers and Data Centres as Generators for Digital Resources 65<br/><br/>Software-as-a-Service: Digital Natives Entering the Enterprise 68<br/><br/>Great Outsourcing of Enterprise IT and the Growth of the Colocation Model 70<br/><br/>When Digital Products Scale – or the Invention of Hyperscale 71<br/><br/>A Change in Architecture – The Rise of Cloud Infrastructure 72<br/><br/>Origin of a Market for Digital Resources 75<br/><br/>When Cloud Infrastructure Became Cloud Services 78<br/><br/>When Microsoft and Google Joined the Party 79<br/><br/>Kubernetes and the Next Layer of Abstraction 81<br/><br/>How Traditional Hosting Companies Have Been Left Behind 82<br/><br/>How the New Paradigm of Cloud Infrastructure Is Changing How Data Centres Are Built 85<br/><br/>Central Role of Connectivity in the Future of Data Centre Architectures 86<br/><br/>Problem of an Old IT Philosophy 87<br/><br/>5 Overview of Infrastructure 89<br/><br/>Power 93<br/><br/>Cooling 97<br/><br/>BMS 106<br/><br/>Fire 106<br/><br/>Security 107<br/><br/>6 Building a Data Centre: Stakeholders, Design, Construction, and Commissioning 109<br/><br/>Stakeholders and Project Stages 109<br/><br/>Pre-project 110<br/><br/>Pre-design 111<br/><br/>Classifications, Standards, and Certifications 112<br/><br/>Design 112<br/><br/>Bricks and Mortar versus Modular Build 115<br/><br/>Procurement 116<br/><br/>Construction 120<br/><br/>Construction Design and Management 2015 (United Kingdom) 120<br/><br/>Commissioning 122<br/><br/>Handover 124<br/><br/>Operation 125<br/><br/>7 Operational Issues 127<br/><br/>Handover 127<br/><br/>Legacy Facilities 128<br/><br/>Operations Team 128<br/><br/>Uptime and Failures 130<br/><br/>Maintenance Processes and Procedures 133<br/><br/>Managing Change 135<br/><br/>Capacity Management 136<br/><br/>Training 136<br/><br/>Performance Optimisation – Beyond Reactive Maintenance 137<br/><br/>8 Economics, Investment, and Procurement of Data Centres 139<br/><br/>Enterprise 140<br/><br/>Colocation 141<br/><br/>Retail Colocation 141<br/><br/>Wholesale Colocation 142<br/><br/>Retail versus Hyper-scale Data Centres 142<br/><br/>Retail Data Centres 142<br/><br/>Hyper-Scale Data Centres 142<br/><br/>Investment and Procurement 143<br/><br/>Investment in Colocation Facilities 143<br/><br/>Power Supply Arrangements 146<br/><br/>Other Complexities 148<br/><br/>Valuation 149<br/><br/>Colocation Leases 155<br/><br/>Wholesale Colocation 156<br/><br/>Retail Colocation 156<br/><br/>Service-Level Agreements (SLAs) 157<br/><br/>Managed Hosting and Cloud Services 157<br/><br/>Total Cost of Ownership (TCO) 158<br/><br/>Merger and Acquisition 159<br/><br/>9 Sustainability 163<br/><br/>Corporate Sustainability 163<br/><br/>Energy Consumption and Energy Efficiency 166<br/><br/>Renewable Energy 170<br/><br/>Generators 171<br/><br/>Water Usage 171<br/><br/>Heat Recovery 172<br/><br/>Life Cycle Impacts 173<br/><br/>Green Building Certifications 175<br/><br/>Policy and Regulation 176<br/><br/>Conclusion 176<br/><br/>10 The Importance of Planning to Avoid Things Going Wrong 177<br/>Andrew McMillan<br/><br/>Introduction 177<br/><br/>Acquisitions and Investments 178<br/><br/>Operating Models and Commercial Contracts 183<br/><br/>Funding Investment 184<br/><br/>Construction 184<br/><br/>Choice of Contract 184<br/><br/>Technical and Pricing Schedules 185<br/><br/>Risk Allocation 185<br/><br/>Usual Suspects 186<br/><br/>Infrastructure Provision and Project Rights 187<br/><br/>Construction 188<br/><br/>Moving to Low Carbon Solutions 188<br/><br/>What Are Data Centre Operators Doing to Transition to Low Carbon? 189<br/><br/>Corporate Power Purchase Agreements (CPPAs) 190<br/><br/>On-site Generation and Electricity Supply 191<br/><br/>Backup Power 192<br/><br/>Where Could Other Efficiencies Be Made? 193<br/><br/>Ensuring Resilience 194<br/><br/>Intellectual Property Rights 194<br/><br/>Data and Cyber/Regulatory Compliance 196<br/><br/>Disputes 196<br/><br/>Conclusion 198<br/><br/>11 Around the Corner, What Could Happen Next 199<br/><br/>Glossary 203<br/><br/>Index 207
520 ## - SUMMARY, ETC.
Summary, etc "As prefaced, this book is written primarily for lawyers, financial and insurance advisors, surveyors, engineers, architects, and other professionals who do not necessarily have direct experience with data centres but need to participate in the subject matter. The intention is to provide the reader with the broad landscape of technical and commercial issues and help identify a high-level overview of critical considerations. We trust that the book should provide the key concepts and terminology to complement their core skills when drafting documents or making business decisions and help them ask more informed questions when working on data centre projects. Data centres are a complex ecosystem with many stakeholders from different disciplines interacting at different phases of the facility's lifetime. The objective of this text is to provide the reader with a full spectrum of the entire life cycle of a data centre from inception to operational use."--
Assigning source Provided by publisher.
545 0# - BIOGRAPHICAL OR HISTORICAL DATA
Biographical or historical note About the Authors<br/>Vincent Fogarty is a consultant with 40 years of experience working on construction and engineering projects. He is a fellow of the RICS, a member of the Chartered Institute of Arbitrators, and a specialist in mechanical and electrical engineering and quantum matters.<br/><br/>Sophia Flucker is an engineering consultant with extensive experience in data centre design, commissioning, and assessment, with years of experience working on projects in multiple countries. She received an Infrastructure Masons IM100 Award in 2020 in recognition of her contributions to the digital infrastructure sector.
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name as entry element Data centers.
Authority record control number https://id.loc.gov/authorities/subjects/sh85035856.
655 #4 - INDEX TERM--GENRE/FORM
Genre/form data or focus term Electronic books.
700 1# - ADDED ENTRY--PERSONAL NAME
Personal name Flucker, Sophia,
Authority record control number https://id.loc.gov/authorities/names/no2023018844
Relator term author.
856 40 - ELECTRONIC LOCATION AND ACCESS
Uniform Resource Identifier https://onlinelibrary.wiley.com/doi/book/10.1002/9781119898849
Link text Full text is available at Wiley Online Library Click here to view
942 ## - ADDED ENTRY ELEMENTS
Source of classification or shelving scheme
Item type EBOOK
Holdings
Withdrawn status Lost status Source of classification or shelving scheme Damaged status Not for loan Permanent Location Current Location Date acquired Source of acquisition Full call number Date last seen Price effective from Item type
          COLLEGE LIBRARY COLLEGE LIBRARY 2025-08-16 ALBASA Consortium 005.74 2025-08-16 2025-08-16 EBOOK