000 -LEADER |
fixed length control field |
05741nam a22003617a 4500 |
003 - CONTROL NUMBER IDENTIFIER |
control field |
CITU |
005 - DATE AND TIME OF LATEST TRANSACTION |
control field |
20220426173021.0 |
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION |
fixed length control field |
220426b ||||| |||| 00| 0 eng d |
020 ## - INTERNATIONAL STANDARD BOOK NUMBER |
International Standard Book Number |
9781119370888 |
020 ## - INTERNATIONAL STANDARD BOOK NUMBER |
International Standard Book Number |
9781786300959 |
020 ## - INTERNATIONAL STANDARD BOOK NUMBER |
International Standard Book Number |
9781119370864 |
020 ## - INTERNATIONAL STANDARD BOOK NUMBER |
International Standard Book Number |
9781119370857 |
020 ## - INTERNATIONAL STANDARD BOOK NUMBER |
International Standard Book Number |
111937085X |
041 ## - LANGUAGE CODE |
Language code of text/sound track or separate title |
eng |
082 00 - DEWEY DECIMAL CLASSIFICATION NUMBER |
Classification number |
658.5 |
Edition number |
23 |
100 1# - MAIN ENTRY--PERSONAL NAME |
Preferred name for the person |
Rezg, Nidhal |
Relator term |
author |
245 ## - TITLE STATEMENT |
Title |
Production and maintenance optimization problems : |
Remainder of title |
logistic constraints and leasing warranty services / |
Statement of responsibility, etc |
Nidhal Rezg, Zied Hajej, Valerio Boschian-Campaner ; series editor Hisham Abou-Kandil. |
264 #1 - PUBLICATION, DISTRIBUTION, ETC. (IMPRINT) |
Place of publication, distribution, etc |
London : |
Name of publisher, distributor, etc |
ISTE/Wiley, |
Date of publication, distribution, etc |
c2016. |
300 ## - PHYSICAL DESCRIPTION |
Extent |
1 online resource |
336 ## - CONTENT TYPE |
Content type term |
text |
Content type code |
txt |
Source |
rdacontent |
337 ## - MEDIA TYPE |
Media type term |
computer |
Media type code |
c |
Source |
rdamedia |
338 ## - CARRIER TYPE |
Carrier type term |
online resource |
Carrier type code |
cr |
Source |
rdacarrier |
490 ## - SERIES STATEMENT |
Series statement |
Systems and industrial engineering |
-- |
Robotics series |
500 ## - GENERAL NOTE |
General note |
ABOUT THE AUTHOR<br/><br/>Rezg Nidhal, Professor, LGIPM/UFR-MIM – University of Lorraine, Ile du Saulcy, - FRANCE<br/><br/>Hajej Zied, Associate professor, LGIPM/UFR-MIM – University of Lorraine, Ile du Saulcy, - FRANCE<br/><br/>Valerio Boschian-Campaner, Associate professor, LGIPM / IUT Metz – University of Lorraine, Ile du Saulcy, - FRANCE |
505 0# - CONTENTS |
Formatted contents note |
TABLE OF CONTENTS<br/><br/>Introduction ix<br/><br/>Chapter 1. Forecasting and Maintenance under Subcontracting Constraint with Delay in Transportation 1<br/><br/>1.1. Introduction 2<br/><br/>1.2. Production without retuned products 5<br/><br/>1.2.1. Statement of the problem 5<br/><br/>1.2.2. Notation 7<br/><br/>1.2.3. Optimization of production policy 8<br/><br/>1.2.4. Total production and inventory cost 10<br/><br/>1.2.5. Analytical study 11<br/><br/>1.2.6. Numerical example 15<br/><br/>1.3. Production with retuned products 20<br/><br/>1.3.1. Statement of the problem 20<br/><br/>1.3.2. Optimization of the production policy 21<br/><br/>1.3.3. Analytical formulation 22<br/><br/>1.3.4. Numerical example 28<br/><br/>1.3.5. Optimization of returned products by a specified deadline 31<br/><br/>1.4. Joint maintenance policy 35<br/><br/>1.4.1. Description of the problem 36<br/><br/>1.4.2. Analytical study 37<br/><br/>1.4.3. Numerical example 39<br/><br/>1.5. Conclusion 44<br/><br/>Chapter 2. Sequentially Optimizing Production, Maintenance and Delivery Activities Taking into Account Product Returns 47<br/><br/>2.1. Introduction 47<br/><br/>2.2. Planning of production, delivery and maintenance 51<br/><br/>2.2.1. Notation 52<br/><br/>2.2.2. Context and assumptions 55<br/><br/>2.2.3. Setting the problem 57<br/><br/>2.2.4. Mathematical analysis 60<br/><br/>2.3. Transformation of the stochastic production, maintenance and delivery planning model to a deterministic equivalent 63<br/><br/>2.3.1. Motivation 64<br/><br/>2.3.2. Transforming the production, inventory and delivery cost (expression [2.11]) into a deterministic equivalent 64<br/><br/>2.3.3. Transforming the service level constraint (equation [2.5]) into a deterministic equivalent 65<br/><br/>2.3.4. Transforming the maintenance cost (expression [2.12]) into a deterministic equivalent 68<br/><br/>2.4. Numerical example and numerical optimization procedure 72<br/><br/>2.4.1. Numerical optimization procedure 72<br/><br/>2.4.2. Numerical example 74<br/><br/>2.4.3. Variability study of delivery time, returned products and service level 83<br/><br/>2.5. Conclusion 92<br/><br/>Chapter 3. A Decision Optimization Model for Leased Manufacturing Equipment with Warranty for a Production–Maintenance Forecasting Problem 95<br/><br/>3.1. Introduction 95<br/><br/>3.2. Description of the problem 100<br/><br/>3.2.1. Notation 100<br/><br/>3.2.2. Statement of the problem 101<br/><br/>3.3. Mathematical model 103<br/><br/>3.3.1. Forecast production plan 103<br/><br/>3.3.2. Maintenance policy 105<br/><br/>3.3.3. Maximum additional cost for an extended warranty 108<br/><br/>3.3.4. Minimum price at which to sell the extended warranty 113<br/><br/>3.3.5. Win–win interval for the extended warranty cost 115<br/><br/>3.4. Numerical example 117<br/><br/>3.4.1. Variation in preventive maintenance and corrective maintenance costs 121<br/><br/>3.4.2. Effects of variation in production period length Δt 122<br/><br/>3.5. Conclusion 123<br/><br/>Chapter 4. Global Control Policy Taking into Account Maintenance and Product Non-conformity 125<br/><br/>4.1. Introduction 125<br/><br/>4.2. Control strategy for stochastic multi-machine multi-product systems: analytical approach 128<br/><br/>4.2.1. Notations 129<br/><br/>4.2.2. Formulation of the cost optimization problem 129<br/><br/>4.2.3. Complexity of the optimal control problem 131<br/><br/>4.3. Description of the production system and the control strategy 131<br/><br/>4.4. Simulation model 133<br/><br/>4.4.1. Simulation principle 133<br/><br/>4.4.2. Simulation algorithm 134<br/><br/>4.5. Experimental analysis 137<br/><br/>4.5.1. Principle of the analysis 137<br/><br/>4.5.2. Determination and validation of the cost function 138<br/><br/>4.5.3. Determination and validation of the availability function 142<br/><br/>4.6. Finding the best compromise between cost, availability and quality: multi-criteria analysis 145<br/><br/>4.7. Conclusion 150<br/><br/>Appendices 153<br/><br/>Appendix 1 155<br/><br/>Appendix 2 159<br/><br/>Appendix 3 169<br/><br/>Bibliography 173<br/><br/>Index 183 |
520 ## - SUMMARY, ETC. |
Summary, etc |
DESCRIPTION<br/><br/>This book focuses on industrial constraints such as subcontracting, warranty, and quality in manufacturing and logistic fields and gives new integrated maintenance strategies. It presents new production and maintenance Control Policies compared to the Hedging Point theory Strategy and different integrated strategies of maintenance are developed under industrial constraints in order to propose a robustness production and maintenance plan. |
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM |
Topical term or geographic name as entry element |
Business logistics. |
700 1# - ADDED ENTRY--PERSONAL NAME |
Personal name |
Hajej, Zied, |
Relator term |
author |
700 1# - ADDED ENTRY--PERSONAL NAME |
Personal name |
Boschian-Campaner, Valerio |
Relator term |
author |
856 ## - ELECTRONIC LOCATION AND ACCESS |
Uniform Resource Identifier |
https://onlinelibrary.wiley.com/doi/book/10.1002/9781119370888 |
Link text |
Full text available at Wiley Online Library Click here to view |
942 ## - ADDED ENTRY ELEMENTS |
Source of classification or shelving scheme |
|
Item type |
EBOOK |