Production and maintenance optimization problems : (Record no. 82037)

000 -LEADER
fixed length control field 05741nam a22003617a 4500
003 - CONTROL NUMBER IDENTIFIER
control field CITU
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20220426173021.0
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 220426b ||||| |||| 00| 0 eng d
020 ## - INTERNATIONAL STANDARD BOOK NUMBER
International Standard Book Number 9781119370888
020 ## - INTERNATIONAL STANDARD BOOK NUMBER
International Standard Book Number 9781786300959
020 ## - INTERNATIONAL STANDARD BOOK NUMBER
International Standard Book Number 9781119370864
020 ## - INTERNATIONAL STANDARD BOOK NUMBER
International Standard Book Number 9781119370857
020 ## - INTERNATIONAL STANDARD BOOK NUMBER
International Standard Book Number 111937085X
041 ## - LANGUAGE CODE
Language code of text/sound track or separate title eng
082 00 - DEWEY DECIMAL CLASSIFICATION NUMBER
Classification number 658.5
Edition number 23
100 1# - MAIN ENTRY--PERSONAL NAME
Preferred name for the person Rezg, Nidhal
Relator term author
245 ## - TITLE STATEMENT
Title Production and maintenance optimization problems :
Remainder of title logistic constraints and leasing warranty services /
Statement of responsibility, etc Nidhal Rezg, Zied Hajej, Valerio Boschian-Campaner ; series editor Hisham Abou-Kandil.
264 #1 - PUBLICATION, DISTRIBUTION, ETC. (IMPRINT)
Place of publication, distribution, etc London :
Name of publisher, distributor, etc ISTE/Wiley,
Date of publication, distribution, etc c2016.
300 ## - PHYSICAL DESCRIPTION
Extent 1 online resource
336 ## - CONTENT TYPE
Content type term text
Content type code txt
Source rdacontent
337 ## - MEDIA TYPE
Media type term computer
Media type code c
Source rdamedia
338 ## - CARRIER TYPE
Carrier type term online resource
Carrier type code cr
Source rdacarrier
490 ## - SERIES STATEMENT
Series statement Systems and industrial engineering
-- Robotics series
500 ## - GENERAL NOTE
General note ABOUT THE AUTHOR<br/><br/>Rezg Nidhal, Professor, LGIPM/UFR-MIM – University of Lorraine, Ile du Saulcy, - FRANCE<br/><br/>Hajej Zied, Associate professor, LGIPM/UFR-MIM – University of Lorraine, Ile du Saulcy, - FRANCE<br/><br/>Valerio Boschian-Campaner, Associate professor, LGIPM / IUT Metz – University of Lorraine, Ile du Saulcy, - FRANCE
505 0# - CONTENTS
Formatted contents note TABLE OF CONTENTS<br/><br/>Introduction ix<br/><br/>Chapter 1. Forecasting and Maintenance under Subcontracting Constraint with Delay in Transportation 1<br/><br/>1.1. Introduction 2<br/><br/>1.2. Production without retuned products 5<br/><br/>1.2.1. Statement of the problem 5<br/><br/>1.2.2. Notation 7<br/><br/>1.2.3. Optimization of production policy 8<br/><br/>1.2.4. Total production and inventory cost 10<br/><br/>1.2.5. Analytical study 11<br/><br/>1.2.6. Numerical example 15<br/><br/>1.3. Production with retuned products 20<br/><br/>1.3.1. Statement of the problem 20<br/><br/>1.3.2. Optimization of the production policy 21<br/><br/>1.3.3. Analytical formulation 22<br/><br/>1.3.4. Numerical example 28<br/><br/>1.3.5. Optimization of returned products by a specified deadline 31<br/><br/>1.4. Joint maintenance policy 35<br/><br/>1.4.1. Description of the problem 36<br/><br/>1.4.2. Analytical study 37<br/><br/>1.4.3. Numerical example 39<br/><br/>1.5. Conclusion 44<br/><br/>Chapter 2. Sequentially Optimizing Production, Maintenance and Delivery Activities Taking into Account Product Returns 47<br/><br/>2.1. Introduction 47<br/><br/>2.2. Planning of production, delivery and maintenance 51<br/><br/>2.2.1. Notation 52<br/><br/>2.2.2. Context and assumptions 55<br/><br/>2.2.3. Setting the problem 57<br/><br/>2.2.4. Mathematical analysis 60<br/><br/>2.3. Transformation of the stochastic production, maintenance and delivery planning model to a deterministic equivalent 63<br/><br/>2.3.1. Motivation 64<br/><br/>2.3.2. Transforming the production, inventory and delivery cost (expression [2.11]) into a deterministic equivalent 64<br/><br/>2.3.3. Transforming the service level constraint (equation [2.5]) into a deterministic equivalent 65<br/><br/>2.3.4. Transforming the maintenance cost (expression [2.12]) into a deterministic equivalent 68<br/><br/>2.4. Numerical example and numerical optimization procedure 72<br/><br/>2.4.1. Numerical optimization procedure 72<br/><br/>2.4.2. Numerical example 74<br/><br/>2.4.3. Variability study of delivery time, returned products and service level 83<br/><br/>2.5. Conclusion 92<br/><br/>Chapter 3. A Decision Optimization Model for Leased Manufacturing Equipment with Warranty for a Production–Maintenance Forecasting Problem 95<br/><br/>3.1. Introduction 95<br/><br/>3.2. Description of the problem 100<br/><br/>3.2.1. Notation 100<br/><br/>3.2.2. Statement of the problem 101<br/><br/>3.3. Mathematical model 103<br/><br/>3.3.1. Forecast production plan 103<br/><br/>3.3.2. Maintenance policy 105<br/><br/>3.3.3. Maximum additional cost for an extended warranty 108<br/><br/>3.3.4. Minimum price at which to sell the extended warranty 113<br/><br/>3.3.5. Win–win interval for the extended warranty cost 115<br/><br/>3.4. Numerical example 117<br/><br/>3.4.1. Variation in preventive maintenance and corrective maintenance costs 121<br/><br/>3.4.2. Effects of variation in production period length Δt 122<br/><br/>3.5. Conclusion 123<br/><br/>Chapter 4. Global Control Policy Taking into Account Maintenance and Product Non-conformity 125<br/><br/>4.1. Introduction 125<br/><br/>4.2. Control strategy for stochastic multi-machine multi-product systems: analytical approach 128<br/><br/>4.2.1. Notations 129<br/><br/>4.2.2. Formulation of the cost optimization problem 129<br/><br/>4.2.3. Complexity of the optimal control problem 131<br/><br/>4.3. Description of the production system and the control strategy 131<br/><br/>4.4. Simulation model 133<br/><br/>4.4.1. Simulation principle 133<br/><br/>4.4.2. Simulation algorithm 134<br/><br/>4.5. Experimental analysis 137<br/><br/>4.5.1. Principle of the analysis 137<br/><br/>4.5.2. Determination and validation of the cost function 138<br/><br/>4.5.3. Determination and validation of the availability function 142<br/><br/>4.6. Finding the best compromise between cost, availability and quality: multi-criteria analysis 145<br/><br/>4.7. Conclusion 150<br/><br/>Appendices 153<br/><br/>Appendix 1 155<br/><br/>Appendix 2 159<br/><br/>Appendix 3 169<br/><br/>Bibliography 173<br/><br/>Index 183
520 ## - SUMMARY, ETC.
Summary, etc DESCRIPTION<br/><br/>This book focuses on industrial constraints such as subcontracting, warranty, and quality in manufacturing and logistic fields and gives new integrated maintenance strategies. It presents new production and maintenance Control Policies compared to the Hedging Point theory Strategy and different integrated strategies of maintenance are developed under industrial constraints in order to propose a robustness production and maintenance plan.
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name as entry element Business logistics.
700 1# - ADDED ENTRY--PERSONAL NAME
Personal name Hajej, Zied,
Relator term author
700 1# - ADDED ENTRY--PERSONAL NAME
Personal name Boschian-Campaner, Valerio
Relator term author
856 ## - ELECTRONIC LOCATION AND ACCESS
Uniform Resource Identifier https://onlinelibrary.wiley.com/doi/book/10.1002/9781119370888
Link text Full text available at Wiley Online Library Click here to view
942 ## - ADDED ENTRY ELEMENTS
Source of classification or shelving scheme
Item type EBOOK
Holdings
Withdrawn status Lost status Source of classification or shelving scheme Damaged status Not for loan Permanent Location Current Location Date acquired Source of acquisition Inventory number Full call number Barcode Date last seen Price effective from Item type
          COLLEGE LIBRARY COLLEGE LIBRARY 2022-04-26 Megatexts Phil. Inc. 52471 658.5 2016 CL-52471 2022-04-26 2022-04-26 EBOOK