A proposed improvement of drainage canal in sitio tugas, barangay inayawan, cebu city (Record no. 47133)

000 -LEADER
fixed length control field 02195nam a2200169Ia 4500
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20200308073511.0
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 190927s9999 xx 000 0 und d
082 ## - DEWEY DECIMAL CLASSIFICATION NUMBER
Classification number T C1119 2014
100 ## - MAIN ENTRY--PERSONAL NAME
Preferred name for the person Cabiso, Jerome A.
245 #0 - TITLE STATEMENT
Title A proposed improvement of drainage canal in sitio tugas, barangay inayawan, cebu city
260 ## - PUBLICATION, DISTRIBUTION, ETC. (IMPRINT)
Place of Publication Cebu City
260 ## - PUBLICATION, DISTRIBUTION, ETC. (IMPRINT)
Name of Publisher CIT-U
260 ## - PUBLICATION, DISTRIBUTION, ETC. (IMPRINT)
Date of Publication 2014
520 ## - SUMMARY, ETC.
Summary, etc An Improvement of the Drainage Canal in SitioTugas, Brgy.Inayawan was proposed in this study. It gives importance to the community and environment which provides an effective flood-control drainage system. Descriptive survey was used and experimental method was done by the researchers to gather data. A questionnaire was made as an instrument in assessing the community?s response to the improvement of the drainage canal.<br/> The main purpose of the study is to design the safest, most efficient and economical drainage canal with respect to the parameters obtained such as volume of wastewater and stormwater that passes into the canal.<br/> Based on the results, the main contributors of stormwater of the drainage canal were Sitio Upper Villa Kawayan, D?who, Issa, Ondras, San Agustin, La Familia, St. Jude Acres 1,2,3 and 4, J. Tabura and SitioTugas. These areas were considered the catchment area of the drainage canal in SitioTugas. The average wastewater discharge and present profile of the drainage was determined through field surveys. After analyzing the results, the trapezoidal concrete drainage connected at the end of the undeveloped drainage canal was proven to be inadequate in conveying the stormwater from the catchment area. Backflow and overflow of stormwater causes flooding in affected areas of SitioTugas. These results were very alarming and that proper flood control management and unbiased evaluation should be imposed.<br/> After gathering the results, a proposed improvement of the drainage canal was designed, specifically a Rubble Masonry-Gravity wall revetment as lining and flood control structure of the drainage canal. This design was provided by the DPWH and was perceived by the researchers to be applicable in the said undeveloped drainage.
526 ## - STUDY PROGRAM INFORMATION NOTE
-- 000-099
942 ## - ADDED ENTRY ELEMENTS
Item type RESERVED BOOKS
Source of classification or shelving scheme
Holdings
Withdrawn status Lost status Damaged status Not for loan Permanent Location Current Location Date acquired Full call number Barcode Date last seen Price effective from Item type
        COLLEGE LIBRARY COLLEGE LIBRARY 2019-09-27 T C1119 2014 T1791 2019-09-27 2019-09-27 RESERVED BOOKS